Aubrey Gravel Co
Aubrey, TX · Denton County
Pale gravel road curving through plowed fields under a clear sky

Aubrey, TX • Denton County

Gravel Driveway Contractors in Aubrey, TX

Crushed Limestone
Crusher Run & Road Base
Driveway Repair
Culvert Installation

Free on-site estimate. No obligation.

Get a Free Driveway Estimate

No obligation. We'll be in touch soon.

Aubrey, TX
Primary Service Area
Denton County
Coverage Area
Free On-Site Estimates
No Charge to Quote
Crushed Limestone + Crusher Run
Materials

Built for Aubrey Clay and North Texas Rain

The soil under much of the area is the Aubrey series, first described in Denton County in 1975 with its type location about 3 miles east of town: sandy loam topsoil over a slowly permeable red clay subsoil with 40 to 60 percent clay. It holds water after a storm, and USDA soil survey data rate its subsoil shrink-swell (linear extensibility) at 4.5 percent. That combination breaks up driveways that weren't built for it. A properly layered gravel driveway, compacted base and all, handles it without rutting out every spring.

Aubrey nearly doubled in population between 2020 and 2025, growing from around 5,000 to close to 10,000 residents as Sandbrock Ranch, ArrowBrooke, Union Park, and other master-planned communities came online. That growth brought a lot of new construction, new acreage buyers, and a lot of driveways that need to cross county clay to reach a home or outbuilding.

Denton gets about 38 inches of rain in a normal year on NOAA's 1991 to 2020 normals, and May is the wettest month, with October close behind. Spring storms hit hard, and driveways without a compacted base wash to the sides by June. A driveway here has to be built for that weather.

Layered base for Aubrey Series clay
Crushed limestone sourced locally from Denton County suppliers
Proper crown grading to drain away from structures
Culvert installation for county road entrances
Get a Free Estimate
Close-up of dark angular crushed stone

Driveway Work by Aubrey Neighborhood

The clay is the same across Aubrey. What it takes to get a driveway right is not, HOA rules, lot size, and how the ground was graded all change the job.

Sandbrock Ranch & ArrowBrooke

Two of Aubrey's newest master planned communities, both built out over the last few years on freshly recompacted Aubrey Series clay. Lots here were graded to the subdivision's drainage plan, which handles the visible front yard fine but says nothing about the gravel spur or RV pad plenty of owners add off the back. Check the HOA covenants, and whether the lot is inside Aubrey city limits, before planning any gravel here; where it is allowed, the usual jobs are rear access drives and extended parking pads.

Union Park & Paloma Creek

Established master planned neighborhoods with a mix of standard and larger lots. Driveways installed during the original build often used a thin gravel layer over unimproved subgrade, which looked fine for the first year and then rutted out the first wet spring. Most calls here are regrade and rebuild jobs: pull the old material, put down a real compacted base, then top-dress with crushed limestone so it actually holds through a North Texas winter.

Rural acreage off FM 1385 and the county roads

Aubrey's edges are still working farm and ranch country, and driveways out here run long, sometimes several hundred feet from the county road to the house or barn. These jobs need a wider base, a culvert at the road entrance, and grading that accounts for pasture runoff crossing the drive rather than just the drive itself. Width matters too: equipment trailers and livestock trucks need more than a single-lane path.

Older Aubrey near US-377 and the historic downtown grid

The original town lots near US-377 sit on older, more settled clay with mature trees and established drainage patterns. Root intrusion and shifting from decades-old trees is the main complication here, not fresh clay movement. Hand-grading around root zones rather than machine-stripping the whole drive keeps the trees healthy and avoids reopening old washout paths.

Providence Village & Cross Roads border lots

Properties straddling the Aubrey and Cross Roads city lines, or just outside either, sit in unincorporated Denton County and fall under the county's culvert and driveway permit process rather than a city building department. Jurisdiction gets confirmed before quoting, since the permit review and the applicable drainage rules differ depending on which side of the line a driveway entrance sits.

Dump truck unloading a pile of fine gravel while a worker watches

Materials Matched to Your Property

Not every gravel works on every Aubrey driveway. The right material depends on traffic load, slope, drainage situation, and whether the driveway connects to a county road that requires a culvert.

Crushed limestone and crusher run are the main materials, both sold by Denton County suppliers, because they compact correctly on local clay; a crushed limestone driveway is the usual build. For lighter-use paths and secondary drives, decomposed granite and #57 gravel are options. The right pick depends on the use and the budget.

Crushed Limestone
Crusher Run / Road Base
#57 Gravel
Decomposed Granite
Gravel Materials Guide →

Does Your Driveway Need Work?

Six Signs Your Aubrey Gravel Driveway Needs Attention

Aubrey TX gravel driveway repair work: a motor grader reshaping a dirt road to restore its crown
Most of the signs below start the same way: the crown flattens out, rain sits in the middle of the drive, and the base underneath goes soft until it is regraded.

Aubrey Series clay fails gravel driveways in predictable ways. If two or more of these describe your driveway, it's past the point where a bag of gravel from the hardware store fixes it.

01

Ruts forming in the same two tire tracks

Gravel that never got a compacted base underneath will rut along the exact path your tires travel, because the load is pressing into loose material instead of a stable layer below it. Regrading the surface without adding base only buys a few months.

gravel driveway repair in Aubrey →
02

Potholes that come back after you fill them

Tossing loose gravel into a pothole is a temporary patch, not a fix. If the same low spot reopens every few weeks, the subgrade underneath is soft or saturated, and the fix has to start below the surface, not on top of it.

pothole repair on a gravel driveway →
03

Gravel migrating to the edges or into the yard

Without edging or a proper crown, gravel walks outward every time a vehicle turns or brakes on it. A driveway that needs a fresh load every year to look full usually has no border to hold the material in place.

gravel driveway maintenance →
04

Standing water or mud at the road entrance

The apron where a driveway meets the road carries the most runoff and the most traffic. Mud or ponding right at that transition point usually means there's no culvert, or an existing culvert has silted shut.

culvert work with a new driveway →
05

Weeds and grass growing through the gravel

Vegetation rooting through a gravel surface means fines and organic material have worked their way into the rock, which happens when there's no fabric barrier between the base and the top layer. It's a sign the driveway is due for a full rebuild, not a top-dress.

rebuilding with gravel driveway installation →
06

Vehicles bottoming out or wheels spinning on wet days

A driveway that feels solid in August and soft and slick after rain has a base depth problem. Aubrey Series clay needs real compacted depth below the gravel to stay stable through wet-dry cycles, and a shallow base gives out exactly when you need it most.

base depth for a new gravel driveway →

What Gravel Driveways Cost in Aubrey TX

Gravel driveway cost Aubrey TX chart: spot repair $200 to $600, regrade $1,200 to $2,500, new installs $1,200 to $9,000 by length
The price ranges from the cost guide, drawn to scale. Length is the biggest driver; a culvert at the road adds $400 to $900.

Real ranges for Aubrey and Denton County, not national averages. Length, base depth, material choice, and whether a culvert is needed all move the number. Quotes are flat rate after a site visit.

$800 to $1,500
Short single-lane spur, minimal base
Rural apron or secondary access
$1,200 to $2,500
100 to 150 ft single-lane crushed limestone
Typical suburban Aubrey lot
$2,500 to $4,000
200 ft standard driveway, full compacted base
Most common Aubrey job
$4,000 to $6,000+
300+ ft rural driveway, wider double-lane
Acreage and ranch properties
$600 to $1,800
Culvert installation (add-on)
Required at most county road entrances
$400 to $900
Annual top-dressing / regrade
Upkeep on an existing driveway

Three things push an Aubrey quote upward. Base depth is the biggest one, driveways that see truck or RV traffic need 6 inches of compacted base instead of the standard 4, and that adds material and compaction time. A culvert at the road entrance is the second, unincorporated Denton County requires one at most new driveway crossings. The third is length: rural lots on acreage routinely run 300 feet or more from the county road to the house, which is a different job than a 100-foot suburban drive.

Full Aubrey Cost Guide →

Permits and Rules for Aubrey Driveways

Driveway culvert at an Aubrey TX county road: pipe on the ditch flowline, at least 12 in of compacted cover, rip-rap at the outlet
Where the driveway meets the road ditch: the culvert sits on the ditch flowline so it drains dry, with at least 12 in of compacted fill over it. A 15 or 18 in pipe is typical on Denton County roads.

Which authority governs your driveway depends entirely on which side of the city line your property sits on. Inside Aubrey city limits, the City of Aubrey Development Services department handles driveway approvals as part of its development review. Outside the city, in unincorporated Denton County, a new driveway entrance off a county road needs a culvert and driveway permit from the county, and that process includes a plans review that typically runs up to 10 working days before work can start.

There's a third case worth knowing about. If your driveway connects directly to a state highway rather than a city street or county road, TxDOT has its own access permit requirements separate from either the city or the county. This comes up most often for properties along the busier corridors on Aubrey's edges.

The permit almost always exists to make sure the culvert is sized correctly for the roadside ditch and doesn't dam up water that's supposed to keep flowing along the road. Skip it and you risk a driveway that floods the road shoulder in a heavy storm, and a county that makes you redo the crossing at your own cost. Find out which authority covers your property and, where a permit applies, get the paperwork moving before the install is scheduled.

Denton County Gravel Driveway Permit Guide →

Serving Aubrey and Surrounding Denton County Communities

Denton County and North Collin County. Contact us if you don't see your area listed.

Full Service Area →
Aubrey TX
Little Elm TX
Prosper TX
Cross Roads TX
Pilot Point TX
Krugerville TX
Providence Village TX
Savannah TX
Celina TX

Gravel Driveways Aubrey TX: Frequently Asked Questions

What gravel material works best on Aubrey TX clay soil?
Crushed limestone is the top choice for Aubrey properties. The local soil is the Aubrey Series, a clay-heavy formation with 40 to 60 percent clay content that sits on the East Cross Timbers terrain. Crushed limestone compacts directly on that clay base, bonds well, and resists the ruts and washouts you get with rounder river gravel. Crusher run (a mix of crushed stone and stone dust) is a close second for access roads and high-traffic driveways. Decomposed granite works for lighter-use paths but needs edging to contain it on sloped ground.
Do I need a permit for a gravel driveway in Denton County?
It depends on where the property is. In unincorporated Denton County, any new drive on a county-maintained road needs a Culvert Permit from Development Services ($300 plus a $75 driveway inspection on the posted fee schedule), and Road and Bridge sizes the pipe within 10 working days. Inside Aubrey city limits the city issues a driveway and culvert permit, and its construction standards require residential driveways to be concrete or asphalt, so gravel house driveways are built outside the city. A drive off US 377 or FM 428 needs a TxDOT access driveway permit.
How much does a gravel driveway cost in Aubrey TX?
Most residential gravel driveways in Aubrey run between $1,200 and $6,000 depending on length, width, base depth, and material choice. A standard 200-foot single-lane crushed limestone driveway with a compacted road base typically runs $2,500 to $4,000 installed. Longer rural driveways on acreage properties and those needing a culvert at the road edge add to that range. Quotes are flat per job after a site visit, so you know the full cost before anything is scheduled.
Keeping gravel from washing out in North Texas rain: a pale, crowned gravel ranch road with grass shoulders
The short answer to the washout question below: keep the crown and the edges open, so storm water runs off the sides instead of down the middle.
How do I keep gravel from washing out in North Texas rains?
Denton gets about 38 inches of rain in a normal year (NOAA 1991 to 2020 normals), wettest in May with a second peak in October. Washout happens when the base isn't compacted deeply enough and when the driveway crown isn't graded to shed water to the sides. The fix is a proper layered install: compacted road base first, then a 3- to 4-inch layer of crusher run or #57 crushed stone, then your top material graded with a slight crown. A culvert at the road entrance keeps water from pooling at the apron. Driveways that wash out every spring were almost always installed without a base layer.
Can I have a gravel driveway in Sandbrock Ranch or ArrowBrooke?
Possibly, but you need to check your HOA covenants first. Sandbrock Ranch, ArrowBrooke, Union Park and Paloma Creek all have HOAs, and HOA covenants commonly set rules for driveway surfaces, so pull your CC&Rs and ask the HOA before any gravel goes down. Two rules sit above the HOA: if the lot is inside Aubrey city limits, the city requires residential driveways to be concrete or asphalt, and any new entrance on a county road needs Denton County's culvert permit.
How deep should the base be for a gravel driveway in Aubrey?
On Aubrey Series clay, plan on a minimum of 4 inches of compacted road base below your gravel surface layer. Clay expands when wet and contracts when dry, which can heave a shallow base over time. For driveways that will see truck traffic, deliveries, equipment, RVs, go to 6 inches of base. The top gravel layer should be 3 to 4 inches, giving you a total depth of 7 to 10 inches. That depth stays stable through the wet springs and dry summers typical of Denton County.
How long does a gravel driveway last in Aubrey TX?
A properly installed crushed limestone driveway in Aubrey should last 10 to 20 years with basic maintenance. The main ongoing task is annual top-dressing, adding a thin layer of fresh material each year to replace what compacts in or washes to the edges. Without maintenance, most gravel driveways need a full regrade and top-dress every 3 to 5 years. The clay soil in Aubrey is actually a good base material once properly compacted, it holds the gravel better than sandy or loamy soil.